Release checklist

Copy this list into the release issue / pull request for every production release and tick each item. A release ships only when every Gate item is checked. Steps refer to the production runbook.

Release: v_._._ · Release owner: ______ · Date: ______

Gate: automated (must be green on the tagged commit)​

  • ci-summary passed in both repositories (this one and OpenJCockpit-frontend; tag both with the same vX.Y.Z), including:
    • backend: unit/integration tests + JaCoCo gates (authorization matrices, restart persistence, policy, hardening tests)
    • frontend (OpenJCockpit-frontend ci-summary): lint, typecheck, tests, build, dashboard and remote images
    • critical E2E (login, unauthenticated rejection, session, API authorization)
    • infra: OPA check --strict + opa test; production compose and Kubernetes manifests valid; no Docker socket / privileged / hostPath; generated realm and PrometheusRule up to date; alert rules valid; deploy scripts shellcheck-clean; backup/restore drill passed
  • release-images published all images for the tag: three service images here (ai-control-service, embabel-agent-service, embabel-agent-runtime; git-mcp-server is built at deploy time), the dashboard image from OpenJCockpit-frontend (non-root check, no fixable CRITICAL CVE)

Gate: manual​

  • Migration review: new Flyway migrations are backward compatible with the previous release, or the release notes say a rollback requires restoring the pre-deploy backup
  • Changes to infrastructure/opa/policies, the realm, SecurityConfig or deployment manifests reviewed by a second person
  • Security review residual risks still acceptable; new risks added
  • Staging deployment of this tag with deploy-k8s.sh / deploy-compose.sh: smoke test passed
  • Staging upgrade from the previous tag with a workflow paused at an approval gate: after the upgrade the gate is still open and can be decided
  • Staging rollback to the previous tag tested (smoke test passed afterwards)
  • A production backup restored into staging within the last 30 days
  • Alerts route to the on-call receiver (send a test alert)
  • Release notes written (features, migrations, configuration changes, rollback notes)

Production​

  • Fresh backup taken (backup.sh / database snapshot) — the VM deploy does this automatically
  • Deployed with deploy-k8s.sh / deploy-compose.sh; smoke test passed
  • Dashboards and alerts quiet for 30 minutes after the deploy
  • Release recorded (tag, time, operator) — namespace annotation / .deploy-history

Approved for production by: ______ (release owner) · ______ (security reviewer)